See all the news at the Tiara Towers website. 

News at Tiara Towers


 

Details of SR A1A Bridge Closure

A second Open House will be held for all citizens interested in, or concerned about, the rehabilitation work that will be performed on the North Causeway bridge this summer.     The rehabilitation work is being done to extend the life of the bridge for a few more years until a replacement bridge can be built, currently scheduled for 2018-2019.

North Causeway bridge aerial

Notification about the bridge can be viewed by clicking on the Bridge Rehab as provided by the North Beach Association.

The Open House will be:

SR A1A North Bridge Rehab
Project Open House
Wednesday, May 20, 2015
4:30 PM— 6:30 PM
Old Fort Pierce City Hall
315 Avenue A,
Fort Pierce, Florida 34950

The Project has been on hold for a few weeks but it is now scheduled to begin June 2, 2015.    The North Bridge will undergo an around-the-clock closure throughout the duration of the project. Two-way traffic will be maintained by temporary signalization at each end of the bridge. When westbound traffic has the green light, eastbound traffic will have a red light, and vice versa.  In other words traffic will move over the bridge one way at a time.

For approximately two weeks, the bridge will undergo full nighttime closures to motorists between 9 p.m. and 5 a.m., at which it will be opened to motorists for one hour at 11 p.m. and 2 a.m. These full closures will not occur on major holidays, weekends prior to major holidays, and weekends following major holidays, and emergency vehicles will be allowed over the bridge during the closure. Two weeks prior to a full bridge closure, message boards will be in place to notify motorists. Motorists should detour north on State Road A1A or U.S. 1 to 17th Street Bridge in Vero Beach.

The bridge draw span will continue to open on demand for marine traffic except for when the bridge undergoes full nighttime closures to motorists. During this time it will be closed to marine traffic for one hour at 11 p.m. and 2 a.m.

Please visit www.d4fdot.com for information on FDOT construction projects in the Treasure Coast.
SR A1A North Bridge Rehab Project
FM#: 429936-1-52-01

 Copyright © *|CURRENT_YEAR|* *|LIST:COMPANY|*, All rights reserved.
*|IFNOT:ARCHIVE_PAGE|* *|LIST:DESCRIPTION|*
Our mailing address is:
*|LIST:ADDRESS|**|END:IF|*