The Tiara Towers Board formed a Plumbing Committee comprised of Mike Izzi of 602 S and James Keirsted of 404 S, to investigate the apparently excessive plumbing blockages that seem to be largely centered around the 02 and 04 Units. Last month presented an occasion where the ceiling under one of the guest baths needed to be opened to investigate a water leak. The Plumbing Committee used this opportunity to examine and study the existing plumbing installation to evaluate possible causes and possible solutions.
Meeks Plumbing was contracted to perform the plumbing work and an experienced member of Meeks Staff was involved in this exploratory effort. Meeks wrote a report evaluating the problem. The Tiara Plumbing Committee has additional information contained in the following report. Both reports can be found on the Maintenance page at the Tiara Towers website.
Tiara Towers Plumbing Committee Report
by Mike Izzi, 5/17/14
The Problem
For many years now, drain stoppages have occurred for the most part in the two interior units which are basically identical except opposite in layout. The solution in the past has been to snake the lines which is reactive, and not long term. This has presented unpredictable functioning of the commodes and many dollars spent for frequent plumber visits. The plumbers’ reports have varied in nature, especially in terms of the distance to the point required to free the stoppage, the accuracy of which has not been substantiated. Each of the affected 02/04 units has two baths, but the problem always is in the guest bathroom. Some stoppages have manifested themselves as connected flow between the commode and tub/shower drains. In some instances the kitchen sink, which is located on an adjoining wall, has also been included. The cast iron drains for these units penetrate a 5 inch concrete floor slab and connections to the stack are made in a dropped ceiling in the unit below. The opinion is that pipe corrosion, drainage slopes and the fittings redirecting the flow might be the problem. There may also be the possibility of venting stack problems.
Action Taken
Over the past several months contact was made with several engineering consulting firms, including OCI Associates who has worked with the Sands and Altamira here on the Island. They all have related experience in high rise plumbing design, have done condition and design assessments and are all interested in receiving an RFP if and when we decide to send one.
On 4/23/2014, a meeting took place to discuss plumbing problems associated with the 02/04 guest bathroom fixtures. Attendees were Mike Izzi, Jim Mikesh, Rick Kimes, Bill Normington, Scott Buday – GM of Meeks Plumbing, Clay Schumann – Supervisor at Meeks Plumbing.
Points of Discussion
- The background and experience of Clay Schumann who was involved in the plumbing installations for several hi-rise condos on North Beach.
- The 02/04 guest bath plumbing problems, past and present.
- Possible anomalies of the drainage and venting system.
- Viewed the original plumbing plans for Tiara, located and obtained from the SLC Building Dept.
- The coincidental removal requirement of the guest bath ceiling due to mold in 702S. This will allow necessary access to view the plumbing configuration.
- Photos will be taken, and the following will be explored and evaluated:
- venting existence and adequacy
- cast iron fitting condition and arrangement will be evaluated
- check whether plumbing system conforms to original plumbing plans.
- The need for enzymes. Enzymes will only function in kitchen drains in which grease and disposal waste is present. For those who do not have a disposal or who are meticulous in keeping any and all grease out of their sink drains, there is little to be gained. Use in lavatories, commodes or tub drains is of no use whatsoever.
On 4/28/2014, the ceiling in the 702S guest bath was removed, making the plumbing from the guest bath in 802S visible. The sheet rock was full of mold due to a leak in the tub drain line. Present was Mike Izzi, Danny Masciana, Bill Normington and from Meeks Plumbing, Clay Schumann and Scott Buday. The following resulted:
Problems found
- A crack in the tub drain line was found, causing the leak to the drywall ceiling below. This must be replaced.
- The length of the drain line run from the tub to the stack is long and does not have a connection to the vent stack. This vent connection is shown on the plumbing plans but was never installed, probably due to limited space.
- It was Clay’s opinion that this inadequate venting, in conjunction with rust in the cast iron drains may be causing the gurgling and backups in the 02/04 guest baths.
- An examination of the roof found that the guest bath stack was 4 inches in diameter and the master bath was 5 inches in diameter. This could contribute to the problem. Clay said at the time that 5 inch stacks were not used and it was probably 4 inches in diameter below the roof.
Action suggested
- While the ceiling is opened, replace the tub drain and toilet drain line with PVC, correcting the leaking joint and providing a smooth pipe interior surface.
- Clay suggested adding an in-line vent to the tub drain line approximately midway between the tub trap and the stack. This vent provides a one way air supply when needed without the need for a connection to the vent stack.
- Add an access louver in the ceiling for future repair work whenever this replacement is done in the future.
On 4/29/2014, Chris, one of Meeks’ plumbers, was at 702S replacing the plumbing in the ceiling . He said the in-line vent should not have been recommended since in-line vents must be installed at a level above the flood line of the fixture being vented. This location was below the tub with no access thru the cement slab. He was also able to see the master bath stack through the dropped ceiling and confirmed it in fact was a 5 inch stack. Chris also said that he has worked on many of these 02/04 units and every time he ran his camera in the clogged drain it always showed the stoppage was in the toilet/tub “Y” fitting. That is where I suspect the 02/04 anomaly is. In addition, a longitudinal crack was found along the tub drain line. He replaced all the cast iron pipe drains with PVC.
Before:
After:
Crack in pipe:
Recommendations
Since this change may correct the problem with backups in the 02/04 guest bath, it must be checked. Therefore I suggest the following be done:
- The owners of unit 802S, Mr. O’Brien, and 502S, Mr. Hoehn, be asked to use the guest bath exclusively for a period of one or two years.
- To provide an additional data point, I would strongly recommend that research be done into Meeks’ records of the repair history of the 02/04 units to determine the worst case and replace that unit’s tub/shower drain with the PVC pipe and also test it simultaneously.
- If this proves to be successful, the same change should be made on an as needed basis when the problem occurs in other units.
- Future evaluation by an engineering consulting firm be put on hold until such time as this fix is fully tested.
Comments
I disagree with those, including members of the Board, who are of the opinion that stoppages in the waste line stack of the 02/04 unit guest baths are mainly due to owner negligence. Although there was some evidence of foreign material present in the 24 year old section of horizontal cast iron shower drain line removed from 802S and shown at the last Board meeting, it had nothing to do with the problem in the 802S plumbing. The toilet clogged at the usual “Y”, as checked by Meeks’ camera, and when the tub was used to shower in, the water backed up into the tub drain, filling the pipe and leaking out of a crack which existed in the top of that pipe.
To comment on Meeks’ email of May 13, 2014 to Tiara, it is true that all cast iron plumbing corrodes, presenting a rough surface to the interior and thereby interfering with the flow of waste in the drains. However that applies to all the plumbing in the building. Therefore, the anomalies present in the 02/04 units must include something else that is cause-specific to those units. Focusing on cast iron pipe does not explain why cast iron is working fine in the master baths of the 02/04 units, not to mention all the cast iron toilet plumbing in the 01, 03 and 05 units.
I believe it is time for Meeks to stop recommending the “enzyme” and the “running the water” solutions and acknowledge that this problem is a hardware anomaly peculiar to the 02/04 units and not necessarily caused by owner negligence.
The task is to identify what hardware should be changed to correct the anomaly and to give an honest appraisal of that task to the Board. The main objective here is to identify and correct the problem, not to determine who is responsible to pay for remedial action. Not doing so only perpetuates the ridiculous notion that only the 02/04 unit owners are negligent, and only with their guest bath, but are meticulous about maintaining their master bath.