A notice from Tiara's Property Management Company, Elliott Merrill, dated September 5, 2017

Notice to all Owners, Residents and Guests

Now is the time to prepare for the possible impact of Hurricane Irma.

Owners need to ensure all items are removed from balconies and catwalks, shutters are closed and water is off to units before they leave.

This is owner’s responsibility and our staff will be unable to complete this.

If a mandatory evacuation is issued, the elevator cars will be taken to the middle or top of the shafts and power to the elevators will be shut off.

Once a mandatory evacuation is issued, all Elliott Merrill Staff will leave the evacuation areas, and will not be able to return until after the storm passes.

We urge all owners to please monitor the storm closely and heed all evacuation orders given by the local authorities.

 

 

Parking Rules Update for the Holiday

Every holiday weekend Tiara parking is a problem.     Your help in providing parking for all is greatly appreciated.    You can help by making sure that your vehicle, and that of your guest(s) or service person, is clearly identified.       Please advise guests that they can and should use guest parking spaces in either lot, and if all spaces are filled, then to park along the grassy shoulder being very careful not to block access to garages, garageports or entryways, especially for emergency vehicles that might be needed.

The rules for parking at Tiara are fully defined in the 2015 Rules booklet.    If you don't have one of these booklet, please contact Jeri or Pete Bullock (1505 S), or Bob Alexander (903 S), or ask Steve for a copy.

Every owner and long term resident is required to have a parking sticker for their car, which is affixed to the window of the car.  The stickers are obtained through the Tiara Maintenance Office.

Every overnight visitor is required to get a parking pass for their car, which can be placed on the dashboard or hung from the rear view mirror.  The pass is available through the Tiara Maintenance Office.

If you are not able to obtain a parking pass, leaving identification of some sort on the dashboard is a reasonable, short-term alternative.   Identify the driver's name, a phone number where the driver can be reached, and the unit that the driver is visiting.

Visitors and service representatives are asked to park only in the marked guest spaces in either the North or South lots, or in the spaces marked immediately outside of the gate to the North parking lot.

There are 2 "unloading" spots at each building.   These are for very short term parking, to assist with unloading items from your car or your service person's car or truck.     Once the unloading is complete the car or truck must be moved to a guest parking spot or your assigned garage or garageport.    Cars left in these unloading spots are subject to tagging and towing after 15 minutes.      Please advise your guests and service people to move their vehicles from these spots to make room for others who need to unload a vehicle.

Reviewing Hurricane Preparedness

New Tiara owners and residents should take note of these preparations for the upcoming months, the most threatening months of the hurricane season, September and October.

Hurricane season in Florida is June 1 - Nov 30th and, though we all hope that no hurricanes will threaten us here at Tiara, we do have to be prepared in case of a weather emergency. If you haven't personally experienced a severe storm you should also visit the photos and stories on the Tiara website under Photo Stories / Hurricanes Hit in 2004. The pictures of the aftermath of the 2004-2005 hurricanes at Tiara are quite interesting.

At Tiara Towers it is mandatory that all hurricane shutters be closed and secured when not in residence during hurricane season.  There will be a fee charged to close open shutters in the event a named storm threatens Tiara.

St Lucie County has published an excellent guide on Hurricane Preparedness. If you are unsure of how to prepare for a hurricane you should take a few minutes and read this guide. It's also been added to the Tiara Website under Support / Maintenance.

Another item that all Florida residents should check out is the way access to the island is controlled after a major emergency. After an emergency, and a major hurricane qualifies as an emergency, St. Lucie County limits access to North Hutchinson Island to those residents who prove that they live on the island.   What you must know is that the "proof" required is a green placard that can be hung on your vehicle's rear-view mirror which is issued by St Lucie County.   Without this placard you will be turned away at the bridges and prevented from getting to Tiara until the emergency conditions are lifted.    Green Placard

The current rules require that the applicant for a "Green Placard" show a Florida Driver's license with a local address plus a recent utility bill or tax bill showing the address of a residence on Hutchinson Island.   The placards are easy to get and take just a minute or two if you bring the required documentation to the deputy at the entrance to the Tax Office at 2300 Virginia Avenue in Ft Pierce.   It's unclear to this author whether  the driver's license must show a Hutchinson Island address or any Florida address.   The following is from the St Lucie County Sheriff's Office website under a topic entitled Disaster Ready.

Barrier Island Re-Entry Program (Sheriff's Office website)

The St Lucie County Disaster Re-Entry Program has been established for residents of our barrier islands to alleviate confusion after an evacuation.  Residents of the barrier island MUST receive a placard to re-enter the island immediately following a disaster.

To receive this placard, each resident must produce two forms of proof that they reside on the barrier island such as a utility bill with a local address along with a local driver’s license.  One placard is issued for each household.

Placards are issued at four locations throughout the county.

 Sheriff’s Office Main Headquarters
4700 West Midway Road
Fort Pierce, FL 34981
 
 St. Lucie West Courthouse
250 NW Country Club Dr.
Port St Lucie, FL 34986
 
St. Lucie County Tax Collector's Office -- Fort Pierce
2300 Virginia Avenue
Fort Pierce, FL 34982
 
St. Lucie County Tax Collector's Office -- Port St. Lucie
1664 SE Walton Rd.
Port St Lucie, FL 34952

Garageport Cabinets

Looking for more storage space?    Do you wonder how your parking "neighbor" was able to add cabinets in a garageport?

Storage in your garageport is allowed if you install the prescribed cabinets.    Until now the Tiara website has not included the cabinet specifications and owners have had to search diligently to find them, usually by asking an owner who has already installed a cabinet.    The specifications are now online under Support/Maintenance/Garageport Cabinets.

A maximum of two (2) wall-mounted cabinets are allowed in each garageport.

The cabinets are to be 36”wide by 30”tall by 16” deep with keyed locks and 180 degree hinges. The cabinet is ¾” plywood with White Laminate inside and out with Masonite Backs with 200lb weight capacity. All hardware to be stainless steel.

If anyone has identified a source for these cabinets, even a custom shop, it would helpful to make that information available to all owners.    If you have identified such a source, send that information to Jeri or Pete Bullock (1505 S) so that it can be published on the Tiara website.     If the Board can locate acceptable cabinets from a local source or even a big-box store that information will be published for all to use.

2017 Summer Report

It's mid-Summer at Tiara Towers!    It's hot, but not so hot as some places in the Southeast, traffic has thinned-out, restaurants are offering specials, stores are un-crowded, the pool temps are in the mid-80s, and the ocean waters are warm.... things are just like the year-round residents at Tiara like it!  And while it seems like lazy times at Tiara, there's been a lot going on.

Social Scene

The Social Committee hosted a very successful Fourth of July party and 30+ residents attended.     All had a great time, enjoying fried chicken and corn bread plus salads and sides from some of the best cooks on the island (Tiarans!).

Friends in the South building have met most Friday evenings at 5 pm for an impromptu social hour, inside or out depending on the weather.   All at Tiara are welcome to join them.

Friends in the North building get together many Friday evenings on the beach and some bring food for a cookout on the beach.

Friends, renters and family members can be found at the pools most days.

Renovations and Maintenance of the Buildings

The renovations for the lobby and mailroom in the North tower are mostly complete and the results of the wallpaper removal and painting have gotten high marks from most everyone.     Accessories are added on an ongoing basis, so if you'd like to suggest additional touches drop a note to Jo Anne Galvin or Linda Dicker.

Renovations in the South tower are on hold until the air-conditioning unit in the South party room, which has been out since late May, is replaced, currently scheduled for about August 8th.     Once the AC is working the wallpaper removal and painting will be scheduled.  Stay patient, South Tower residents, the "new" lobby is coming!    We're not exactly sure why it's taken so long to get the AC up and running but we're told by Carrier that the unit we need won't be available until early August.    In the meantime, enjoy the pool and the beach and visit the North party room for your indoor activities.

After several delays due to weather, the parking lots have been sealcoated, which was needed to extend the life of the lots, and as a result the lots are looking less worn out and old.    Notice how crisp and clean the new North lot looks.

New control units have been installed for the HVAC/AC systems in both buildings.

All of the old water heaters in individual units have now been replaced.  This was a project begun in early 2017 and thanks to the cooperation of all unit owners has now been completed for 2017.     Each year the Board will monitor aging water heaters and notify unit owners if their water heater needs to be replaced.

Space was freed up in the South storage rooms by moving old Tiara records to the EM offices.

Projects in Process

New black lanterns are being installed at the entrance to Tiara and in the pool areas.  Two are already installed and the others will be scheduled to be installed as soon as parts have arrived.

Two unit doors that have rotted out will be replaced in early August.  Painting of less severely rusted unit doors and stairwell doors, frames and sidelights will begin this summer and be ongoing until complete.    Broken and failing garbage chutes will be fixed.

The railings on both beach walkways will be painted and the gates fixed as needed.

Pressure washing of the border wall along SR A1A on the south side of the entrance has been done and the wall on the north side should be done by mid-August.

Maintenance (Steve) has been cleaning out the AC drain lines in all units.   Those in the South tower should be complete by the end of July, and in the North tower by mid-August.  This work has been occurring after normal work hours in the afternoons and on Saturdays.    Please let Steve know if you need any special scheduling for your unit.

Pools and Spas

The North pool pump has been replaced, necessitating several "no pool days" for the North tower residents who were encouraged to use the South pool.  The timer for the spa (North pool) was not working and was replaced.

The South pool has been leaking water due to missing grout;   grout has been repaired by the service company and the leaking has stopped.

Each spa has one heat pump and 1 gas water heater.  These units are at the end of  life in a marine environment. David from the service company strongly suggest replacing the 2 gas heaters and one heat pump at this time.  His case made sense, the north heat pump may have one more year. The spas are six year old!    Bids are being sought.

There are several new pool chairs at both pools, 4 at North pool and 1 at South pool, replacing the chairs that were broken beyond repair.   Each pool should have 20 chairs now.   The outdoor grills have been serviced with special attention to the controllers and regulators.

Projects Awaiting Bids

The Board plans to resurface both spas and bids are being reviewed.

Cleanout of the dryer stack units are out for bid.

Telecom

Status of the Comcast contract

The Board approved and executed a 5-year contract with Comcast in May.  Tiara has not received a fully signed and executed contract back from Comcast; therefore, the savings and additional services (HD and rewiring of condo units as needed at no cost to owners and/or the association) involved have not gone into effect.  They (Comcast) continue to delay execution of the Agreement for unknown reasons.  By delaying, they have effectively turned a 5-year contract term into one that is somewhat longer than that.  On the positive side, they recently had a site survey conducted to determine what will be involved in rewiring units for owners who wish to upgrade Comcast’s bulk services.  This situation has been a continuing frustration for the Board which has worked diligently to get Comcast to respect their verbal and written commitments and move forward.

We'll provide more information on the new Comcast contract as it becomes available.

Level 4 - New option for Internet and Phone service

Level 4 is an internet vendor selected by the Board to install cabling at Tiara which will bring Tiara unit owners another option for Internet and phone service.    This offering is entirely separate from the Comcast contract for bulk TV service and in no way interferes with or prevents a unit owner from continuing to use their current service provider for phone and/or internet.

A subcontractor is already working on bring a new fiber optic cable into the building for the Level 4 service and will be terminated at a service location in the South tower.    Over the next couple of months Level 4 will lay conduit that will connect both towers, essentially offering these new Telecom options to all unit owners and providing the basis for future site-wide communications capabilities.    Once Level 4 completes its installation, details on Level 4's internet and phone service options and pricing will be communicated to everyone.

Coming up in the Fall

Landscaping - The oleanders on the A1A side of our border wall were hard-cut in the Spring, prior to making any decision to replace them.   They have been coming back nicely and are looking better all the time.

Gates and poles in the tennis courts will be repaired and/or replaced in the Fall.

A major project to be evaluated this Fall is whether or not to convert the pools and spas to salt water rather than chlorine.    Here's what I learned about this topic by "googling" on the web at:

https://www.fixr.com/comparisons/saltwater-vs-chlorine-pool

Chlorine and Salt Levels

It is a common misconception that saltwater systems do not have chlorine 1. In fact, these systems are currently the most popular of the chlorine systems. A saltwater pool will have lower levels of chlorine than a traditional chlorine pool because the chlorine is produced at a steady level rather than added to the pool with chlorine sticks or tablets. Salt is added to the pool instead, and a saltwater generator produces hypochlorous acid for sanitation through electrolysis, which is the breakdown of the salt by passing electricity through the saltwater solution.

Despite the name of a saltwater pool, the salt content is approximately that of human tears, about one-tenth the salinity of ocean water. Swimmers can open their eyes underwater, and their skin feels softer after a swim.

Check it out yourself if you're not familiar with this process.

It's not an inexpensive option but could be expected to pay for itself in reduced maintenance costs over a few years.    It's worth considering for 2018 or beyond.

Hurricane Season

Finally, tho there's certainly no end to other ongoing maintenance projects being done here at Tiara, the Board wants to remind everyone that we are in hurricane season.   If your unit will be unoccupied for any length of time please remember to close your shutters.   If Tiara is threatened by a hurricane, as it was last year, and your shutters are not closed, there will be a $200 fee levied if Tiara staff has to close your shutters.

 

SealCoating Schedule Changed

DUE TO HIGH WINDS THE SEALCOATING OF THE SOUTH LOT HAS BEEN DELAYED.    CURRENT PLAN IS TO BEGIN THE SEALCOATING OF THE SOUTH LOT ON WEDNESDAY JULY 21ST. PLEASE LEAVE YOUR CAR PARKED IN THE NORTH LOT. THANK YOU FOR YOUR PATIENCE.

 

THE SEALCOATING OF THE NORTH LOT IS RESCHEDULED FOR NEXT WEEK.

PLEASE CHECK THE ELEVATOR MESSAGE BOARD OR THE MAILROOM BOARD FOR MORE UPDATES.

2017 Parking Lots to be Sealcoated

Parking Lot Sealcoating to Begin Next Week

Note: Schedule may be changed in case of rain.

 

South Lot (pink)

  • Monday June 19 - sealcoating of entire lot. All vehicles must be moved out of the pink area by 8:00am on the 19th

  • Tuesday June 20 - striping of entire Lot. Vehicles may be returned to lot after 6:00pm on the 20th

North Lot (yellow)

  • Wednesday, June 21 - sealcoating of entire lot. All vehicles must be moved out of yellow area by 8:00am on the 21 st.

  • Thursday June 22 - striping of entire Lot. Vehicles may be returned to lot after 6:00pm on the 22nd

ALL vehicles must be removed from all uncovered parkinq spaces, from the entire lot, PRIOR TO THE START OF WORK.

NO DRIVING WILL BE ALLOWED INTO OR OUT OF THE ENTIRE LOT DURING THE SCHEDULED WORK PERIOD.

If you do not move or make arrangements to move your vehicle it will be towed at your expense.

 

PLAN AHEAD

  • If your vehicle is parked in your garage or garageport and you intend to use it on the days work is scheduled for your lot, remove your vehicle the day before work begins and park it in the other lot. The unoccupied garageports in the closest row will be opened and you may park in any of them.  DO NOT close the garageport as you won’t have the code to reopen it.
  • Advise any contractors or delivery services or guests that access to your lot will be prohibited on these days.
  • Refrain from walking on the newly sealcoated area to ensure that the tarry material used in the process does not get on your shoes and tracked into the building or any other places you may be going.
  • Make other plans for walking your dog until the sealcoated lot is completely dry.

If you have any questions please contact Holly at Elliott Merrill Community Management at hleide@elliottmerrill.com or call 772-466-2630

Thank you for your cooperation during this project!

 

Lobby Update

The North Lobby is sporting its new color scheme and most residents say it looks great!

The wallpaper in the front lobby, elevator lobby, mailroom, and hallway to the party room has been removed.  These areas have been sanded and patched and painted with a color scheme that complements the lobby furniture.

If you haven't seen the decorating in the North Tower please take a look the next time you're here.     The Decorating Committee has made a great start in brightening and modernizing the look of Tiara.

The same work will be done in the South Tower in mid-July.   The delay is due to the need to install a new air conditioning unit in the South party room, which should be done about mid-July.  Then the upgrade to the South lobby can begin.

Some of the changes in the North lobby are pictured here.   Accessories are subject to change so this is not the final view.

North lobby showing teal border at ceiling

North Elevator Lobby before mirror was rehung

Hallway to party room

North Mail Room - all in teal for a nice complement

 

Please Welcome A New Owner

Another new owner to Tiara!

 

1402 N -  John and Megan Williamson live in Okeechobee, FL.     They expect to spend weekends and perhaps some weeks this summer at Tiara.

 

 

We're glad you're here!!

Summer – Fall 2017 – Planned Maintenance Activity

Bill Dicker,  Tiara Board President, has published a list of maintenance items to be completed over the coming months.  It promises to be a busy summer.

              Tiara Towers Summer and Fall Projects – 2017

Summer

  1. Seal coat both parking lots
  2. Install new control systems for HVAC/AC in both towers
  3. Complete scrape and paint in south Tower south elevator shaft
  4. Remove wallpaper, paint foyers and halls both bldgs. – stopping at entrance to community rooms
  5. Replace garage (not garageport) drip caps in both building parking areas
  6. Re-marcite spas in both building pool areas
  7. Install new black lanterns in pool areas and at Tiara entrance
  8. Replace 2 unit doors – rotted out – 201S and 1401S
  9. Paint 2x4 railings on both beach boardwalks, repair and paint wood gates
  10. Repair east end of South Building boardwalk
  11. Begin painting less severely rusted unit and stairwell doors, frames and
  12. Repair several failing garbage chute doors in both bldgs..
  13. Replace ageing and failing pool chairs
  14. Level 4 cable install for internet and VOIP service
  15. Clean dryer stacks
  16. Clean out all unit AC condensate lines
  17. Blow out all garageports and powerwash outside of garageport & garage doors

 

Fall

  1. Repair rusted/damaged poles, etc. on tennis court
  2. Replace oleanders on A1A side of complex wall
  3. Decorating committee – foyer art and accessories
  4. Contract out remaining seriously rusted unit and stairwell doors, frames, sidelights
  5. Investigate converting pools and eventually spas to salt rather than chlorine
  6. Garage Buildings: north facing garage doors (9 in north lot and 7 in south lot) remove rust, prime and paint
  7. Stencil “Propane” pipe in north bldg.