In February 2017, at the request of Tiara's Board of Directors, the Telecom Committee conducted a survey, attempting to reach all owners, to identify Tiara owners' current telecom capabilities and their desires for any additional or optional services.    These are the results of that survey.   Click here to view the original survey.

  •  160 emails were sent out via the Tiara Towers Newsletter which covered 118 Units or 81% of the total owners plus 6 annual renters.
  • A survey form was posted in the Mail Room of each building,
  • Survey forms were available at the Super Bowl Party, and
  •  2 in-person interviews were conducted.
  • Responses were received from 58 persons representing 40% of Tiara’s total Units
    • 25 responses from the emailed Newsletter
    • 23 responses from the two Mail Rooms
    • 8 responses from the Super Bowl Party
    • 2 in-person interviews

Results

  • 45 Units, 78% of those responding, ARE interested in having a 3rd option for their Internet and/or Condo Phone
  • 13 Units, 22% of those responding, are NOT Interested in having a 3rd Internet/Phone option here at Tiara

The responses indicated:

  • Current providers for internet service are:
    • Comcast               29 Units               50% of total responses
    • AT&T                     11 Units               19% of total responses
    • Did not specify  11 Units                  19% of total responses
    • None                     7 Units                  12% of total responses
  • Current providers of Condo Phone are:
    • None                     18 Units               31% of total responses
    • AT&T                     14 Units               24% of total responses
    • Comcast               12 Units               21% of total responses
    • Did not specify  11 Units                  19% of total responses
    • MagicJack            3 Units                  5% of total responses

 

Conclusions reached by the Telecom Committee

  • 45 Units with Owners or annual Renters are interested in having a 3rd option for Internet/Phone service.
  • Respondents favored the 3rd option at a ratio of 3.6 to 1.

These survey results encouraged the Board to further investigate what it would take to make it possible to have a 3rd provider of telecom services for Tiara owners.     That provider, Level4 Telecom, has submitted proposals which will be submitted for legal review.

New Rule for Tiara Owners – Replacing Hot Water Heaters

Last year the Board authorized an inspection of all water heaters at Tiara and determined that there were a number of water heaters that are over 10 years old.    The Board's research said that water heater failures increase as the heaters get older and at 12 and 13 years are a risk to you and to your neighbors.   Because of the increased potential for water leaks from failing hot water heaters this year the Tiara Board added a new rule for Tiara owners, as follows:

 

No hot water heater may remain in use once it is 13 years old: the date to be determined by the manufacturer’s tag on the unit.

It will be the owner’s responsibility to replace said water heater.  If the owner does not replace the heater within 60 days of Board notice, the Board may choose to replace it upon giving the owner a 30 day notice.

Any costs associated with the removal of the old water heater and the installation of the new hot water heater will be the obligation of the unit owner. If the owner does not pay the costs incurred by the Association within 90 days of being billed by the Tiara Association, the Board may choose to suspend all of the owner’s privileges granted by the Declaration.

You can confirm the age of your water heater by looking at the front panel and finding the Manufactured Date (MFG DATE).    If your water heater is more than 13 years old it must be replaced.     If it is older than 10 years old you should consider replacing it soon.

Board Meeting – 2-28-2017

The February Board Meeting for 2017 was held on February 28th in the South Party Room, Bill Dicker, Board President, presided.    There was a larger than usual number of owners in attendance and good discussion with the Board.

Bill Dicker prepared a President's Letter summarizing the work carried out at this meeting.

          Tiara Towers Board Meeting – February 28, 2017

President’s Report

Good Morning.  Great developments are happening at Tiara Towers - wish you were all here.

1.       A majority of the Tiara Committees gave reports:  New rugs for the lobbies; new wall treatments for foyers, etc.; new landscaper hard at work; shutter lube and inspection complete; reserve CD’s being re-invested; garbage chutes under repair; upcoming parties and events scheduled; parking areas to be sealcoated, new domestic water pumps on the way. A $15,000.00 reimbursement check (summer generator failure) was received and deposited.

2.      New Business:

a.       As a result of our revised documents we now complete credit and criminal background checks on all new owners and criminal background checks on all tenants.  Our rental and sale application forms have been revised.  Application fees have been raised to $150.00 for rentals, leases, and sales. Recent problems with tenants arriving before application forms have been received or arriving tenants without any notice from unit owners prompted the development of new rental and lease guidelines that were adopted at the meeting and will soon be posted in both buildings and on the Tiara website news reports.

b.      Letters have gone out to all unit owners who have hot water heaters over 10 years old.  Those with heaters between 10-13 years old are urged to replace them as soon as possible.  Those with heaters over 13 years of age are required to replace them in the next three months.  The Board adopted a rule at this meeting on this matter. It too will soon be posted and included in Tiara email notices.

c.       2016 finished financially with an approximate $22,000.00 surplus.  The Board voted to allocate $10,000.00 to the Mechanicals reserve account, $6,000.00 for the purchase of two ellipticals in the fitness rooms, and $6,000.00 for the decorating committee to use on Board approval.

d.      Plastic bag dispensers of been installed at the beach end of each boardwalk to assist those beach walkers who also pick up beach trash as they walk.  These were provided by the North Beach Association as part of their efforts to protect our beaches and the sea turtles.

e.      The Telecom Committee has been exploring an initiative that would allow a Comcast competitor, Level 4 Telcom, to offer cheaper internet and VOIP telephone service in contrast with the existing options offered by Comcast and AT&T. This program would involve the install of new cable and control systems to bring the service to the buildings for about $14,000.00. Connecting to this service will be at the owner’s choice. This company, Level 4, would also install a barely visible antenna on the roof to broadcast their services to the surrounding area for which they will pay the Association $7,000.00, cutting the install price, and thus the cost of the whole project, to approximately $7,000.00.

Before going further with this appealing concept the Board will send the contracts to our attorney for review.  More on this at the next meeting or before.

 

Respectfully submitted by,

Bill Dicker, President

Lobby Rugs

New Rugs

The lobbies have been given a face-lift.     The new furniture, in place for a few months, has been augmented by new area rugs and most owners are quite pleased with the progress.    Next, the Decorating Committee will consider painting the lobby and elevator areas.

 

Watch for new info in the coming months.

 

 

 

Old Rugs

The Board has decided to offer the old rugs for sale to any interested owner.    The rugs available for sale are the 4 gold colored, custom made, wool rugs, approximately 7' x 9' , with pad, that were recently removed from the lobbies.     For your inspection one rug will be opened up in each party room in the next few days.     Offers to purchase may be sent to anyone on the Board.

 

2017 Shutter Inspections

    Tiara Towers Shutter Lubrication and Inspection Program

Hurricane shutters are our first line of defense in hurricanes, tropical storms, severe thunderstorms, and tornados.  Over the past few years the Board has taken many steps to insure that unit hurricane shutters are up to the job.

For the last six months the maintenance committee has been considering a number of different alternatives we have not tried before.  At the last board meeting, the Board adopted an all-unit, Board funded, shutter lubrication and inspection program to commence in the next few weeks.  Three shutter companies submitted bids and the Board gave the contract to a company named Shuttertek.

Once the program is completed in the next few months (before the start of hurricane season) every unit will have had it’s shutters lubricated and inspected.  If a unit’s shutters are not deemed hurricane ready, the unit owner will receive an explanation of the problem.  It will be their responsibility to correct the problem before hurricane season.  If there are minor issues the unit owner will be notified and they may or may not elect to have the work completed by Shuttertek or a company of their own choice.

During the course of each unit’s maintenance, a Board member or a volunteer owner will be in the unit to provide security and oversight of the work.  Announcements will be posted in the building and in the elevators to keep owners aware of when units are going to have their shutters lubricated and inspected. (This memo will be posted on the Tiara website)

If the program is a success this year, the Board will consider continuing the program into the future.  Questions or concerns?  You may reach out to any Board member or maintenance committee member: Dan Masciana, Bob Alexander, Bob Liepa, Ed Galvin, Bill Dicker, Ray Hettche.

 

Update:  The inspections will start Monday, February 6th, with units in the North building.

New North Causeway Bridge Update

Tuesday evening, January 31st, the Florida Department of Transportation held a public meeting in Fort Pierce to inform residents of their decision on replacing the existing bascule bridge over the intercoastal waterway on Shorewinds Drive.     The presentation and all of the project documents are available on the FDOT website at www.sra1anorthbridge.com

FDOT proposes to build an 86 foot high bridge that allows for unimpeded vehicle and marine traffic at this crossing.    The west end of the bridge will be close to, but a little north of, the current intersection at Shorewinds Drive and US 1, "fly over" the FEC railroad and Old Dixie Highway, and the east end will land approximately 2000 feet east of the current bridge landing.    Juanita Avenue will be extended across US 1 to Old Dixie Highway and the intersection at Juanita and US 1 will have a signal light.     Access to the marinas and to Harborcove will be via Old Dixie Highway but not directly from Shorewinds Drive, as exists today.    Anyone wishing to get to the restaurant at Harborcove from North Hutchinson Island will need to continue over the bridge to US 1, take a right at US 1 to Juanita, then a right at Juanita and another at Old Dixie Highway which will provide access to the marinas and Harborcove.    The new bridge will allow for both pedestrian and bicycle traffic, in addition to 2 lanes of vehicle traffic, one lane each way.

The project is open to comments for the next 90 days and the directions for comment are on their website.

Work is scheduled to begin sometime in 2019 and extend into 2020.

Click below to see a picture of the bridge looking south on Old Dixie Highway showing the bridge fly over at FEC and Old Dixie Highway.

Bridge Rendering Board_Alternative 2

2017 Shutter Inspection

At the Board meeting, January 25, 2017, the Board voted to fund the inspection and lubrication of all hurricane shutters in all units as long as the total expenditure does not exceed $11,000.

If you normally hire an outside company to service your hurricane shutters you might want to wait and take advantage of the inspection and lubrication of your shutters that could be provided at no out-of-pocket cost to you.

No date has been set for this activity at this time.

Board Meeting – 2017-1-25

The first Board Meeting of 2017 was held on January 25th in the South Party Room, Bill Dicker, Board President, presided.    There was better than average attendance of the owners and the meeting had a full agenda and lasted for 1 hr and 45 minutes.

Bill Dicker prepared a President's Letter summarizing the work carried out at this meeting.

Tiara Towers Board Meeting – January 25, 2017 – President’s Report

Good day all.

The meeting on Wednesday was very productive.  A short summary follows.

  1. Ed Galvin, John Rowinski, and Jeri Bullock were commended for their service to the community.
  2. A majority of the Tiara committees reported on their plans for 2017.
  3. Our property manager gave a report on work completed in the last month and spoke about efforts to repair several units after a slab leak in the north building and water leaks from prior storms on the 14th and 15th floors of both buildings.
  4. The Decorating Committee was authorized to purchase four carpets for the lobbies of both buildings as part of the redecorating program. (Reserve expense)
  5. The Telecom Committee was authorized to investigate a program that may provide more competitive prices for internet and VOIP telephone service.
  6. The Board authorized an expenditure up to $11,000.00 to fund an all unit hurricane shutter lubrication and inspection program. (Operating Budget)
  7. The Board authorized an expenditure of up to $10,500.00 to seal coat our asphalt roads and parking areas. (Reserve expense)
  8. The Board will send letters to all owners who have hot water heaters aged 10-12 years urging that they replace those heaters in the coming months.
  9. The Board will send letters to all owners with hot water heaters aged 13-27 years giving them 3 months to replace them or the Board may replace them at owner expense. (Affirmative Legal opinion obtained on this issue). New rule to be adopted.
  10. The board approved a motion that will direct the business office of Elliott Merrill to pay off the note financing our insurance policies for 2017 in February in order to save over a thousand dollars in interest.
  11. The Board authorized the expenditure of up to $34,000.00 to replace the domestic water booster pumps and their control systems in both buildings. (Reserve expense).

 

We are always seeking volunteers for our many committees.  They are the heart of our Tiara community.  There is a committee for every interest.  Please get involved.

 

Respectfully submitted by,

Bill Dicker - President

 

At the meeting the Telecomm Committee made a presentation documenting its conclusions that Tiara owners should be offered additional options for Internet and Phone service.      The presentation can be viewed here as Telecom Committee Report.

The topic of older water heaters was discussed during the January 25th Board Meeting and, as the President's Letter indicates, letters will be sent out soon to all owners having water heaters > 10 years of age.     As some background for the concerns that the Board has about older water heaters please take a few minutes to read the attached article on Water_Heater_Failures

The listing of the 2017 Committees and their chairpersons is now available on the Tiara website at Tiara Towers/Your Tiara Board/Committese.    A listing is also available on the bulletin boards in the mailrooms.

 

Duplicate Bridge classes at the Riverwalk Center

On Monday and Thursday afternoons there is a duplicate bridge class at the Riverwalk Center in Ft. Pierce, followed by an afternoon of bridge games.     You can attend the class or just go to play cards.     There are flyers up in both mailrooms with the particulars.

Monday 12:15 PM   Free Class followed by an afternoon of cards ($6.00)

Thursday 12:00 PM  Free Class followed by an afternoon of cards ($6.00)

The class is free.      It's $6.00 for an afternoon of cards.

Jan 2017 – North Beach Association News

The first Members' Meeting of the North Beach Association, January 9th, was an opportunity to meet the new St Lucie County Commissioner representing North Hutchinson Island, District 9.     She is Cathy Townsend, a longtime resident of SLC, a past owner of the Melon Patch Inn just north of Tiara, and a recent member of the SLC Planning and Zoning Commission.     Cathy is in favor of expanding the SLC airport and opening it up to medium-sized private and commercial air traffic.    She's targeting cargo companies like Fedex and UPS and has had talks with Bahama-based companies seeking to establish flights to/from the islands.

Other items noted at the meeting:

  • SR A1A is now also named Atlantic Beach Boulevard from the inlet north to the county line.     Either designation can be used and the post office should recognize either.    UPS and Fedex and other shippers, as well as navigation systems (Google Maps) may take a little longer to recognize the name.  Road signs are in place at the corner of Shorewinds Drive and Atlantic Beach Boulevard as well as at Marina Avenue, on the south edge of the Grande Beach property.
  • FDOT is hosting a meeting on January 31st at 5:30 pm at the Riverwalk Center to explain its plans for the bridge to be erected in place of the current bridge on Shorewinds Drive at the river.
  • The old Radisson property (Ruffin Property) is back up for sale - no buyer.
  • The Grande Beach property across the street is back up for sale - no buyer.
  • Expect work to begin at the water treatment plant across the way to install a new pumping station as part of the project to convert all septic tanks remaining on the island to sewer connections.   This is probably a multi-year project due to funding issues.
  • Be aware that a nude beach exists north of the nuclear power station on South Hutchinson Island.   There are signs posted at the beach.