Community Meeting – Monday April 16th

You are invited to attend a Community Meeting on Monday, April 16th, at 1:30 PM in the South Club room.   At the Community meeting Board President Bill Dicker will discuss the pipe cleaning project that Tiara needs to address.

 

     Tiara Towers Pipe Cleaning Project

 Why – Several months ago sewage backed up into 201N.  Meeks was asked to investigate the two soil stacks to determine the condition of the pipes.  They were found to be badly clogged.  Since then there have been increasing situations involving clogged pipe in both buildings.

Background -  About five years ago it was discovered that the vertical drains were badly. clogged.  Meeks was contracted to clean the pipes.  At first they cleaned from the top down and clogged the feeder lines coming from each unit.  They then cleaned from the bottom up. It would appear now that they did not do a good job or the pipes clogged up again.

Our System -  Each unit has access to two vertical soil stacks, one laundry stack, one AC condensate stack, and one dryer vent in addition to being serviced with water and access to the cooling tower system.  The dryer vent has been cleaned as well as the AC condensate stack.  To our knowledge the laundry stack has never been cleaned.

Investigation – Over the past several months we have been monitoring the situation and interviewing seven pipe-cleaning companies who specialize in cleaning pipes in buildings such as ours as well as relining cracked or broken pipe.  Three of the companies have made site visits and we have been able to interview them further.

The Plan to Move Forward -  Part 1: Contract with the front-running company to camera the vertical soil stacks and laundry lines plus the horizontal branch lines under the building slab that collect material from the verticals moving it to the main line that goes to the street. The purpose of this is to acquire a complete picture of how seriously clogged our pipes are.  Part 2: Get more precise bids from the two front-running companies based upon the camera information and then move forward with the company selected.  Most companies have said they can clean a stack a day.  When cleaning a stack it is out of service. All stacks will be returned to service at the end of the work day. We would also hire an engineer with expertise in this area to examine the camera footage to determine if the job was done well and if pipe repair is justified.

 

Unknowns

  1. Exact state (degree of clogs and condition of the cast iron pipes themselves) of pipes in question: vertical soil and laundry stacks, branch lines. (We are convinced we have a problem)
  2. Will the laundry stacks have to be cleaned as well as the soil stacks and branch mains? (Will know once we have camera footage)
  3. Precise cost of the Project (Very rough estimate $50-85,000.00 – or more if we have to clean everything plus the services of an engineer – will know once we have camera footage)
  4. Will we have to re-line pipe or replace pipe once they are clean and cameraed (3-5% of the cost of the project)
  5. Exact amount of assessment (Not really known at this time – will be determined once the work is completed)

 

Board Meeting April 19th

The next Tiara Board Meeting will be held on Thursday, April 19th, at 10 am in the South Club Room.

All owners are invited to attend.

 

Tiara Towers Notice

Board of Directors Meeting – Thursday, April 19, 2018

 

  1. Call meeting to order: Proof of Notice and Establish Quorum
  2. Approval of Prior Minutes: March 2, 2018 (unread)
  3. Manager’s Report
  4. Treasurer’s Report
  5. Committee Reports: Landscaping, Decorating, Maintenance, Telecom, Parking
  6. Old Business
  7. Door Painting Project, Tennis Court Project, Spa Project, Mulch, Tree Removal
  8. Cooling Tower upgrades:
  9. Pool lighting upgrades
  10. Propane tank to BBQ
  11. TV’s in community rooms and fitness rooms
  12. Painting donation – South bldg..
  13. Spa covers
  14. North community room mold remediation and drywall install
  15. North tower exit gate repair
  16. New Business
  17. Glass in lobby doors – both buildings
  18. Jarvis Restoration
  19. Soil/Laundry Stack Camera and Cleaning Project
  20. Unit door number plaques
  21. New Business
  22. Adjournment

 

 

Update on Parking Decals

New parking decals and a supply of guest passes have been distributed to annual lessees and owners in residence and available at Tiara.

Having your own supply of guest passes means that you can easily give one to your guests and renters without notifying the Maintenance Office, or remembering to request one for weekend guests.

If you are at Tiara and have not received yours, please contact:

  • Alan Winslow (1302 N) in the North tower
  • David (Maintenance Office) for the South tower

If you are not at Tiara your new decals and passes will be held for you at the Maintenance Office.    When you are next at Tiara, please stop by and pick up your packet from David, our Maintenance Supervisor.    Note:   If you arrive at Tiara (North tower) during April or May you may contact Alan Winslow for your decals and passes.    After May, the Maintenance Office will hold all parking packets until picked up.

Your new renters should check the unit for parking passes left by previous renters.    If none are available the new renters can pick up passes from the Maintenance Office.

We are asking for 100% participation in using the new decals and passes so please start using yours as soon as you receive them.

New Parking Decals and Passes

Parking Decals and Guest Passes

Tiara is issuing new decals for your vehicles and starting new procedures for guest and renter parking tags.

The new decals and several re-usable visitor tags will be hand delivered to all owners and tenants/renters on site at present.  We are relying on the owners or tenants to be responsible for identifying their own vehicle with a window decal, whether parked in a garage, car port or open air space, and to identify their guests' vehicle with the temporary hanging passes.  The decals and passes are coded so that that your unit number is not identifiable by someone outside of Tiara.

Decals are being issued to all Owners and Annual Renters.

Seasonal renters will use the new temporary passes that hang on the rear view mirror in your car.

If you are out and about we may miss you when we delivery the parking packets.   If you do not receive a parking packet please contact us for yours:

In the North Building – Tom Carroll, 804 N, 248-535-2615

In the South Building – Jeri Bullock, 1505 S, 510-914-0257  or        Bob Alexander, 903 S, 407-497-1102   (Bob has packets for units on floors 1-9; Jeri has packets for units on floors 10-15)

If you need a 2nd (or 3rd decal) please contact Jeri Bullock.

You will no longer have to request a temporary pass for your guests from David – instead you will have several guest passes in your parking packet that you will give to your guest upon his/her arrival.   The guest passes are coded to identify your unit.   Please try to retrieve the parking pass when your guest departs.

The new decals and guest passes are valid as soon as you receive them.

Owners who are not at Tiara

The decals and passes are NOT being mailed to owners who are not present at Tiara.    Instead, when you are next at Tiara please contact the Management Office in the South Building to pick up a packet of decal(s) and re-usable guest passes.    On the weekend you can contact Jeri Bullock or another Board member for assistance.

If you rent your unit please tell your renter to pick up a packet of guest passes from the Management Office in the South Building, or again, to contact a Board member for assistance.    Renters should use a guest pass for their car(s) and keep the others in the packet for their guests.

The guest passes should be left in the unit at the end of the rental period for the use of your next renter.   Remember, guest passes are reusable and are coded to identify your unit as the unit associated with the vehicle displaying the guest pass.

Additional guest passes are available by contacting the Management Office.

Spa Renovation

In the North building the spa will be "out of service" on April 12-13 so that the spa can be resurfaced.

For the South building the dates are April 16-17.

Please plan on visiting with your neighbors in the other building and using their spa while yours is being renovated.

 

Mark Your Calendar – Spring Get-Togethers

There are still a lot of parties and get-togethers planned for the next few months.      Everyone is welcome - owners, guests, and renters.

All events are in the North Club Room and sponsored by the Tiara Social Committee unless indicated otherwise.

April 4 - Trivia Night, 7 PM, Wednesday, South Club Room (Not sponsored by Social Committee but all are welcome)

April 7 - Spring Brunch potluck 11 AM, Saturday

April 20 - After Dinner Mix and Mingle with group game 7 pm, Friday

May 5th - Kentucky Derby Party 4 PM, Saturday, South Club Room

 

 

 

 

Comcast ReCabling – FAQs

Once again, some of the commonly asked questions about the Comcast ReCabling project.

Tiara Cable Upgrade: Frequently Asked Questions

  1. Must I have a signed Opt-In document?   Each condo must have a signed document on file to indicate if your condo has been upgraded to the new RG-6 cabling or not.
  2. Why is this project taking place? The new contract with Comcast included this project.
  3. Why are we replacing cable? The new cable (RG-6) is state-of-the-art cable designed to handle high-definition TV and internet signals whereas the old cable (RG-59) was only designed for old, standard-definition TV.
  4. Why do I need to upgrade the wiring if Comcast installed signal boosters in my condo? Signal boosters need a power source and are not reliable for smart TVs.  The current cables cannot always carry the signal properly to support the demands of today’s electronic entertainment devices.  Upgrading to the new RG-6 cables will eliminate the need for these signal boosters.
  5. What happens if I Opt-out? Comcast may not support any condo with the old cabling.  You will be responsible for the cost of all service calls that are determined to be signal issues related to the old cabling.  You may also be restricted from contracting with other service providers who could require RG-6 cable to support their services.
  6. What if I decide to upgrade at a later date?  Should you decide to upgrade after the completion of this upgrade project, you would be responsible for all costs associated with the upgrade to your condo.  The cost could be as much as $1,400.00 or more to complete your condo based on current estimates.
  7. Who owns the wires to our condos and who owns the wiring within our condos?  Comcast owns the wiring from the street and all vertical backbone wiring within the electrical closets.  Tiara Towers owns the horizontal wires from the electrical closets to your condo and within its walls.  You control how the wires within your condos are used.
  8. Who is paying for this project? Comcast
  9. Why can’t Comcast install a wifi box to support full services without rewiring? That technology is not specified in our current contract with Comcast.
  10. Who is installing the new RG-6 cable? Comcast is sending its “A-team” subcontractor.
  11. When will this project take place? Sometime in the next 2-4 months.
  12. How extensive will the cable project be? The new cable will be mostly invisible as it will be primarily in the dropped ceilings and walls.  However, it will be necessary to run some cable around a door frame in some floor plans and above the base molding for short distances in all floor plans.  All exposed cable will be enclosed in white wire molding that is approximately 1.25 inches high, 0.4 inches deep and cut to the necessary length.  (Refer to photos on the Tiara website.)  The cable will be connected to the living room and the three bedroom TV outlets AND to any other TV outlets where you have a TV.
  13. Who is responsible for patching the walls? The installer will use faceplates and surface wire molding as needed.  Patching should not be needed.
  14. Where is the 4-way splitter to be installed? The splitter will be installed at the main service drop in your condo, near your current service drop location.  This varies by condo floor plan.
  15. Will the splitter be visible? It will be installed with a faceplate at the main service drop.
  16. Can they do a partial install?   Comcast may not support any condos with the old cabling.  The intent is to upgrade all condos with RG6 cables to ensure continuity for service calls.  You will likely be charged for all service calls addressing signal issues on the old cabling.
  17. Will new cable be joined to existing cable? No – Your condo will no longer use the old RG-59 cable.
  18. Will there be any cost to the condo owner? As previously described, there is no cost to the condo owner for the Comcast project.  However, after Comcast has completed their project in your condo, if you want to hide the cable in your walls rather than have it in the wire molding, that is possible.  We have found contractors who will do it if you wish for under $250.  (In unusual circumstances, it may cost more.)  We are continuing to look for additional vendors who can do this work.   We will post their contact information on the Tiara website before Comcast begins their project.  Stay tuned.
  19. Will the old cable be removed? Only the run from the electrical closet to the first TV outlet will be removed. All other old wiring will remain in the walls.
  20. Will my TV reception and internet be better with the new cable? Possibly and probably. The new cable will definitely deliver a higher quality signal to each condo.  The change in individual condos will depend on the type and number of TVs you use, whether you use a DVR, how “aged” your 30 year-old wiring has become, etc.
  21. Can another vendor use the new cable? Yes, if it is not being used by Comcast.
  22. Will the new cable allow us access to Comcast services that we don’t have access to now? Yes, if you order the additional services that will be at an additional cost to you.
  23. Suppose I opt out of the new cable, what will happen? Refer to the Advantages and Disadvantages that are listed in the opt-in/opt-out letter.  You will continue to receive the services that you have now.  However, service upgrades might not be possible AND in the future Comcast or other vendors may not be able to provide service which means you would have to re-cable at your own expense.
  24. If I am not here when the project takes place, will there be security. Yes, someone will be there to watch over your condo: board members, telecom committee members, EM personnel, volunteers, etc.
  25. What happens if I don’t return the form. A non-return will be considered as an opt-out. However, we will make every effort to contact all non-return people to make sure of their intent.
  26. How long will the work take in my condo? About two hours unless there is an unusual difficulty.
  27. Will they clean up when they are done?   The owner of a condo that has been completed raved about how careful the installers were while in her condo and how meticulously they cleaned up after the installation was complete.
  28. I want my cables buried in the walls without wire molding. What should I do?  Check the “opt-in” option and indicate “No” to the wire molding.  Your response will indicate to the installers to leave the new cables exposed and secured out of the way, reduce damage to the painted surfaces, and make it much easier for your cable to be hidden behind the door frame and baseboard molding.
  29. I will not be available to hire and supervise a vendor to hide my cables. What should I do?  Complete the opt-in/opt-out letter as described above.  Once the project begins, there will be a list of vendors who will hide your wires posted on the Tiara website.  You can also contact Bob Alexander and explain your situation.   As a neighbor and not in his capacity as Telecom Committee chairman or South Building Captain, he will explain how he may be of assistance to you..

 

 

A Trivia Party

All Tiara residents are invited to a Trivia party tomorrow in the South Club room.    This is a resident-sponsored and inspired activity, not a Social Committee event.

TRIVIA

PARTY

 

 

WEDNESDAY, 21 MARCH 7:00 PM

SOUTH BUILDING SOCIAL ROOM

 

BYOB and $2.00 entry fee

No RSVP required; just show up with your thinking cap

AN IMPROMPTU SOCIAL MIXER

 

Tiara is Painting all Unit Entry Doors

The project to paint all of the Unit doors and their frames is beginning today, Monday March 12.    The work will begin in the South tower on the 15th floor and progress down, painting the doors on 3 floors every day.     The South tower is expected to be completed in one week and the North tower work should begin next week.  The schedule of floors for the South tower has been posted in the elevator.

While the doors are drying they will be left open.   To ensure security Tiara has arranged for a security guard to monitor the floors where the work is being done and the doors are open.

In addition to the Unit entry doors the stairwell doors are also being painted.   A small number of doors that are in extremely poor condition will be replaced and then painted.

Thank you for your cooperation with this project.

March Newsletter – President’s Summary

Board President Bill Dicker summary of the Board Meeting held Friday March 2, 2018.

 

 

                          Tiara Towers Condominium Association

President’s Report

Board Meeting – Friday. March 2, 2018

The Board met to deal with some routine matters and to discuss details associated with the re-wiring or cabling of the two towers by Comcast in accord with our contract for Comcast bulk services.

Painting will soon take place involving the external surfaces of all unit, stairwell, and utility room doors.  As these doors will be open until the paint dries the Board has hired a security guard to patrol the floors being painted.

The Board also approved the mulching of the property, expenses related to the modernization of our HVAC system, and the replacement of seven doors which are corroded beyond repair.

The rewiring of the building for Comcast services with state of the art cable will involve the install of cable behind unit walls but in some cases on the owner side of unit walls.  Owners will be asked to voice their preference as to whether they want to be included in the project or to keep the system that currently exists.  A letter will be sent to all unit owners describing the project, the advantages and disadvantages of opting in or opting out with a section where they have to make the choice to have their unit re-wired or not.  If the letter is not returned a non-response will be considered as a refusal to participate in the project.

 

Respectfully submitted by. . .

Bill Dicker

Association President

March 10, 2018