FloridaState Weather Alerts
There are currently no active weather alerts.

Login Status

News

News around Tiara

Architectural Review Committee

In 2017 the Board of Directors set up an Architectural Review Committee to oversee all major renovation projects undertaken by unit owners at Tiara.     Projects that require significant modifications to the unit must be approved ahead of time.    The Mission Statement and the form to be used were approved by the Board at the December meeting.  The Architectural Renovation form will be available from the website at Support / Helpful Forms and Documents or from David Pugh in the Maintenance Office at Tiara.

                          Architectural Review Committee

Mission Statement

The Architectural Review Committee was created to provide Association oversight, as an arm of the Board, of specific homeowner renovation projects (unit and/or garage) that may influence the integrity of the building and/or the well-being of Association members.  This oversight encompasses the following:

  1. Receipt and preliminary approval of Specific projects by the Committee and the Board with respect to contractors and workers involved, their credentials, some construction materials, and prospective timelines.
  2. Inspection of the work, in progress, to insure compliance with original proposal and Association Rules.
  3. To ensure compliance with all state and local ordinances that relate to the proposed project.

Projects Not Requiring Architectural Review

  1. Interior painting, wallpaper, paneling, wall tile, removal of popcorn, install of ceiling   finishes, replacement of electrical fixtures, replacement of toilets and plumbing fixtures, replacement of interior doors, installation of crown molding or trim, replacement of kitchen cabinets or bathroom vanities; replacement or install of new countertops. (Contractors who might be hired to complete this work must be licensed, insured and bonded)

Projects Requiring Architectural Review

  1. Replacement of exterior doors, sliding doors, windows, hurricane shutters.
  2. Install of floor tile (or some other product) and/or replacement of floor tile or some other product. The application of tile, stamped concrete or some other material (other than paint) to unit balconies.
  3. The replacement or relocation of existing plumbing or the install of new plumbing and/ or sprinkler heads/pipes.
  4. The removal (in whole or in part) of existing walls or the install of new walls.
  5. The relocation (or replacement) of existing electrical wiring or the install of new electrical wiring

Application Process

  1. Owners planning a renovation project requiring Architectural Review Committee and Board approval must submit the details of their project to Elliott Merrill and thus to  the Committee at least three weeks before the beginning of the project.
  2. This submission (on the appropriate form) should include the following: scope of work; contractors involved with proof of license, bonding, and insurance; copies of appropriate building permits (which may be obtained after Board approval); materials; timelines; and acknowledgement of Association rules regarding when work may be done and the responsibilities of owners and contractors (cleaning up in public spaces, not using our dumpsters, parking in appropriate places, using service entrance, work hours: 9:00AM-5:00 PM, Monday-Saturday.)

Approval Process

  1. The Architectural Review Committee will review the submitted application form and  submit their findings to the Board for approval.
  2. The Board will consider the findings of the Architectural Review Committee and render a decision in a timely manner.
  3. The Board retains full authority regarding the requested project. . .
  4. The Board may accept any or all of the Committee’s recommendations
  5. The Board may reject any or all of the Committee’s recommendations
  6. The Board may add conditions or modifications for approval as the Board deems appropriate.
  7. The Board will then, through Elliott Merrill, inform the owner of the Board’s decision.

 

Click here for the Architectural Review Form to open it as a pdf.

Arch Rev. Form

Opinion Survey Results

The Newsletter conducted a pool opinion survey in December which it mistakenly identified as a Board-requested survey.   We jumped the gun and the Board was not ready to take a survey.  Nevertheless the editors of the Newsletter thank you for your responses.     And the results were:   Sixty-three readers answered the survey and the results were split almost 50:50 between leaving the pool temps as currently set (84 degrees) and raising them a degree or two.

 

 

Private Parties at Tiara

From time to time an owner or renter may wish to use the Club Room in either building for a private party.    This is perfectly ok, and permission is granted by the Maintenance Supervisor at Tiara on a first-come, first-serve basis.    Here's how to reserve the room.

PRIVATE PARTIES:

Tiara rules state that unit owners must get management approval for private parties.

Forms are available from the Maintenance Office and a $50 (refundable) deposit will be
given to the Maintenance Supervisor. A Notice (prior to the event) must be posted of a Private Party with date and time.

The Social Committee agreed to allow the use of items such as coffee pots, ice buckets, flatware, folding tables, and utensils. The unit owner holding the party should coordinate with the Maintenance Supervisor or a Social Committee member, prior to the party, to have any required items made available. Consumable goods, such as paper products, plastic ware, coffee, etc. are solely for the use of Association social activities events and not for private parties.

Please note that while you may reserve the Club room for your invited guests other Tiara owners and guests must be able to pass through the Club room to and from the pool area and will occasionally need to use the facilities in the Club room.

2018 Social Committee Activities

The first party of 2018 is almost here!     The Social Committee is hosting its Welcome Back! party on Friday, January 19th at 6 pm in the South party room.     All owners, renters and guests are welcome.     If you're new to Tiara, come and meet your neighbors!    If you've been away for a while, join the party and renew friendships.

This party will be a Meet and Greet Happy Hour.     You bring an appetizer to serve 12 and your own beverage of choice.

January 19th

6 pm

South Party room

 

 

Planning for 2018

The Social Committee is composed of everyone who wants to get involved and help to plan the parties at Tiara.    It meets several times throughout the year to decide on the schedule.     New owners and long-term renters are welcome to come to the first Planning Meeting of 2018, to be held on Monday, January 15th, at 10 AM in the North party room.   Bring your ideas, and a little bit of energy, meet your neighbors and have a good time.

Flood Insurance Declaration for 2018

From time to time Owners need to see what Flood insurance coverage Tiara carries.   The Tiara Flood Declarations document can be accessed here.    The 2018 Flood Insurance Declaration includes coverage for each building as well as separate coverage for both sets of garages.   You can view the Flood Insurance pdf file and download it and/or print as needed.     2018 Flood Insurance Declaration.

All of the Insurance documents for 2018 are available at www.tiaratowers.org under the menu item Support / Helpful Documents and Forms.

 

Continuation of Members’ Meeting in December

Update from Continuation of Annual Members’ Meeting

Dec 14, 2017 and Dec 21, 2017

 

The purpose of the Members’ meeting on Dec 14th was to approve the 2018 Tiara Budget and to tally Members’ voting for either Full or Partial Funding of the Reserves for 2018.    The Board approved the Budget but a quorum of owners’ votes, either in person or by proxy, was NOT met at the Dec 14th meeting and the meeting was continued until Dec 21, 2017.    

At the Dec 21st meeting it was determined that a quorum of owners’ votes and proxies was met and the voting on the 2018 Reserves could be held.     The Owners voted to fund the Reserves at a Partial level, which is the way the Reserves have been funded for the past several years.

With this level of funding the Quarterly HOA fee in 2018 will be $1942.00, as was noted in the Budget document mailed to all owners.

 

Happy New Year 2018

The editors and owners of the Tiara website and the Tiara Newsletter, Jeri and Pete Bullock, wish all our neighbors and friends a very Happy New Year!

As we begin 2018 we want to make it very clear that the Tiara Newsletter and the Tiara website are personal communication vehicles for owners and residents at Tiara Towers.   They are not official communications from the Tiara Board of Directors.

The stories and the postings are hopefully of some interest to the Tiara community but they remain the opinions and views of the editors and contributors.      Anyone is invited to author a news item or suggest a topic for sharing and it may be published.

Information about the Tiara Towers Condominium Association may be published from time to time at the request of its Board of Directors but only mailings from the Board via Elliott Merrill Community Management should be accepted as official communications from the Board.

Any future surveys or opinion polls posted should not be construed to be approved or sponsored by the Tiara Board.     As an example, the recent Pool survey was mistakenly labelled as a Board survey but was in fact not approved by the Board.

Anyone who creates a profile on the Tiara website in order to view the protected pages on the website will also be placed on the mailing list for the Newsletter.     If you do not wish to receive the Newsletters that may come out from time to time you may unsubscribe from the Newsletter by following the unsubscribe link on this Newsletter or by sending an email to to the webmasters at tiaratowers1@gmail.com.

Join the Bridge Group at Tiara

The Bridge group is looking for new players.      The group meets on Thursday evenings at 7 pm in the South Tower club room.   Everyone is welcome, singles or couples.   The play is fun, it's "party bridge", and the cost is $1 per evening.

Have you thought about joining the group playing Bridge in the evenings but thought "it's been too many years since I played" ?

Thanks to Barry Bragin (704 S) that concern can be put to rest.   Barry is offering refresher classes at 6:30 pm on Thursday, prior to the regular scheduled games.     If you've played at all and are interested in getting back to the game, let us know, and join us at 6:30 pm on Thursday January 11th in the South Party room.     After the refresher session you are welcome to join the regular games or just observe, whatever is most comfortable for you.

This refresher session is not for true beginners - we'd like you to have some experience with the game but even if it's been 35 years since you last played, it'll come back.  Join us!

If there's enough interest in an actual beginner's class, one might be considered later this year.

For the refresher sessions, call Barry or Eleanor Bragin and let them know you'll be there. 301-580-3537 or  301-512-9728

For the regular games, if you want to join the group, a courtesy call to Jeri Bullock (1505 S) would be appreciated.  510-914-0257

Tiara Pool Survey

The Tiara Board of Directors would appreciate your response to this Pool Survey.

Pool temperatures are currently set at 84 degrees in the winter months.    Raising the pool temperatures 2 to 3 degrees will increase our FPL bill but the exact increase is tricky to estimate, since it's based on many factors including wind speed, outside temperatures, as well as gallons of water in the pool.     Some Tiara owners who would like to enjoy the pools throughout the winter months have expressed a willingness to accept an increase in overall expenses for operating the pools in exchange for a more pleasant pool experience.  Tiara's Board of Directors has requested that a survey be conducted of Tiara residents regarding their use and satisfaction with the pool amenity.

Basically the decision in this matter must balance an incremental increase in pool operating costs against the incremental increase in resident satisfaction with use of an asset which already has fixed costs as well as current ongoing operating costs.  This survey is intended to shed some light on that current satisfaction.

In order to get a good tally it's helpful to have your unit number on your response.  Please enter that information as Building and Unit Number, for example as N 105.

Click here to open up the Pool Survey which will only take a minute of your time.   Thank you for your participation in this Survey!

 

 

News from the Annual Owners Meeting

President Bill Dicker updated the Members on several items during the Annual Owners Meeting.

Painting of the South Club Room will begin on or shortly after December 11th and should be completed by the end of 2017.      Painting of the North Club Room will be done in January once the leaks in the south wall of the room are repaired.

Representatives from Otis Elevator will be onsite to speak to Tiara Owners at a public meeting, to be held probably in January 2018, about the state of our elevators and the next steps that Tiara needs to take to refurbish or replace them.   Notices will be sent out when dates and information are available.

The Shutter inspection program that was done in 2017 was successful in getting all Tiara's hurricane shutters "storm ready".     Because the shutters are now deemed to be in good working order a similar inspection and maintenance will NOT be done in 2018 but may be considered again in 2019.      This does not mean that individual shutters can be ignored in 2018.    Shutters do need regular maintenance to stay in good working order and all owners are advised to do their own maintenance in 2018 or contract with one of the local shutter companies.

The latest Comcast contract, signed this past summer, offers Tiara Owners bulk TV services until Dec 2021.    Owners can receive HD programming at no additional cost; it's part of the bulk contract.   If you have HD-capable TVs and do not yet have a Comcast HD settop box or adapters, you must call Comcast and request the equipment.  You can pick it up at the Comcast Vero Beach office, or have Comcast ship it to you or for a service fee Comcast will bring the equipment to your unit and install it for you.    And there is a new BULK CONTRACT phone number to call for service, questions, or billing.    Call 866-384-2307 and tell the representative that you want to speak with a rep who is knowledgeable about BULK contracts.   If at first you don't get through, try again.