FloridaState Weather Alerts
There are currently no active weather alerts.

Login Status

News

News around Tiara

North Beach Association Mtg – Nov. 10, 2014

The Monday evening meeting was a Members Meeting, and all those who joined the North Beach Association were invited to attend.     Most of the meeting was devoted to a brief update by Mr. Lee Dobbins, the attorney for Mr. Ruffin who is the party that purchased the old Radisson site across from the Cumberland Farms gas station and mini-mart.   With him was Mr. Dennis Murphy, a member of the Culpepper and Turpening engineering firm that will be responsible for engineering at the property once all the approvals are awarded.   Mr. Bob Lowe, the real estate agent for Mr. Ruffin, was also present in the audience.

Have you seen the large, bright yellow sign that has been erected on the southwest corner of the property?   The sign is big but the type is pretty small, so you'd have to walk up to the sign to really read it.  And then you have to try to understand the legalese of the language.   The signage is required by law and it announces the first meeting of the Planning and Zoning Commission  to consider the new "Commercial Resort" category for St Lucie County zoning.   Once the 2nd meeting is scheduled that date and time will be added to that sign.

This is the probable timeline.

November 20th at 6 PM:   IMPORTANT MEETING of the Planning and Zoning Commission for St Lucie County.   There will be a presentation by County staff to the P & Z Commission about the new zoning category and the public can speak out in favor of or against the adoption of this new category.

There are actually 4 items on the agenda for Thursday's meeting.

  • The new zone Commercial Resort zoning category
  • Changes to the Comprehensive Plan of the County and Land Development codes
  • A change to the Land Use code for the Ruffin/Radisson property from Residential (its current coding) to Commercial Resort
  • A change to the Zoning code for the Ruffin/Radisson property from Residential to Commercial Resort

If you don't intend to offer public comment at the meeting, the County offers archives of many of its public meetings on the Meetings page at its website, where you can view a video of the meeting a day or so after the meeting takes place. Select Planning and Zoning Commission in the Group dropdown menu box and then scroll down the meeting list to the meeting date of interest. There you will be able to download a full Agenda Packet as well as view the Video of the specific meeting. Agenda Packets are generally posted a few days before meetings and Videos are generally posted a day or two following meetings.

January, 2015:   If approved, beginning in January 2015 the 4 items will be presented to the Board of Commissioners  (BOCC) of St Lucie County for its consideration and approval.    There will be 2 meetings, with the public invited and able to speak out, for or against, adoption of these items.

Likewise, you can view and download Agenda Packets a few days in advance of BOCC meetings, and you can view the Videos a few days following BOCC meetings, at the same County Meeting webpage referenced above. Select Board of County Commissioners in the Group dropdown menu box.

March / April, 2015:  The BOCC should complete its review and act on the new zoning category in general and specifically for the Ruffin/Radisson property.

Spring / Summer 2015: If approved, the Engineering and Design team for the Ruffin property will begin the design and concept drawings for the development of the property.

2017:   Construction might begin.

2018:    Expect at least 1 year for the build-out of the planned hotel resort.

2019:    Anticipated EARLIEST opening of the planned hotel resort.

That yellow sign may be the ONLY public notice of these meetings.    There will be NO notices of these meetings mailed to everyone on the island.   There WILL be documents available on the St Lucie County website  and these will be the official documents used by the Planning and Zoning Commission and then later by the Board of County Commissioners to evaluate and approve (or disapprove) the proposed changes to the county-wide zoning and land-use codes and then the specific changes that will be requested by the Ruffin attorneys for their property.   NOTE:  Documents on the county website are usually only available a few days prior to the meeting.

Between now and Spring 2015 the public may offer ideas and suggestions about the Ruffin property and what should, or should not, be included in its design.    THIS IS IMPORTANT because once the design is underway the public, you and I, will not be encouraged to put forth more ideas.

Members of the North Beach Association asked questions of Mr. Dobbins and Mr. Murphy regarding the planned development of the property.

What occupant density is changed by the new Commercial Resort zoning category?

Ans:  Commercial Resort will allow a couple of extra units per acre over the existing Commercial zoning that would be used when building an "ordinary" hotel.
Note: Hutchinson Island condos are allowed 9 units per acre.

How many rooms are planned for the hotel?

Ans: 400 rooms

Is there any change to the height restriction with the new Commercial Resort category?

Ans: The Ruffin property will be held to the existing height limitation of 125 ft, which is a county-wide restriction.

Almost all of the attendees who spoke up at this meeting touted the quietness and the slow pace of living here on Hutchinson Island, and expressed displeasure that the hotel/resort would create no "off season" for the island and that there would be a consistent increase in traffic and visitors if the hotel/resort is to succeed. Most of those who spoke appeared to be owners from Aquanique.

If YOU want to learn more about the plans for the County-wide changes or about the Ruffin property itself you are ENCOURAGED to attend the P&Z Commission and BOCC meetings as they are scheduled.     You may SPEAK OUT in support of the project or against it.    Typically those that are against a project do attend and speak; those who don't care or are in favor of a project are usually silent, assuming all will be well.    This would be a mistake.   If you are IN FAVOR of the development of the Ruffin / Radisson property you really should attend and make your SUPPORT known to the Commissioners.

Proposed Budget for 2015

Due to excellent management, and hard working employees, and a magnificent Board of Directors, Condo quarterly fees will decline slightly in 2015, if adopted by the unit owners.

The proposed budget can be viewed by clicking here.

The proposed budget will be mailed to all unit owners on Monday, November 17th.   Watch for it!

 

Maintenance and Landscaping

Due to the hard work of the Landscaping Committee, and the diligent efforts of Doug Chartrand and Ron Hutchins, the nursery is planning on replanting trees in place of the damaged palm trees Friday morning, Nov. 14th.   These are on the East side of the South Building between the grassy area and the beach.

The Board and the maintenance staff have worked hard over the summer to make sure Tiara Towers stays in tip-top shape for everyone.      All of these projects were completed over the summer.

Projects and Maintenance items May 2014 - October 2014

  • Entry Doors painted both towers
  • East Coast cut sea grapes
  • Garages painted by American Environmental
  • Stairwell spalding south building repaired
  • Gutters reinstalled south building
  • Curbs painted north and south entries
  • AC condensate line flooded pump room - repaired
  • North entry cracks in stucco repaired
  • Valves replaced north dune walk
  • Dune walk stringers repaired and replaced both north and south
  • Pool railing secured
  • Crack in planters repaired
  • Replaced three trash chutes
  • Entry sign painted
  • Concrete curbs outside of trash rooms repaired
  • Fire sprinkler pipes replaced by Life Safety
  • Fire sprinkler pipes painted by AE
  • Common area doors replaced by AE (trash and boiler/roof)
  • Porte cochere roofs painted
  • Pool motor replaced
  • Catwalks painted
  • Trash room doors painted
  • Valves replaced north dune walk
  • Fire system (sprinkler/strobes/pull stations) replaced throughout property
  • New heater replaced at pool
  • New panic hardware installed (stainless) for exit doors
  • All floors cleaned by contractor per agreement
  • New FOB system for both towers
  • Roof repairs various
  • Well's, pumps, motor (ongoing)
  • Trash Chute doors replaced
  • Dead palm trees removed

 

Upcoming Board Meetings

Hi Everyone,

Please mark your calendars for these Tiara Towers Board meetings this week!

Monday, Nov. 10th at 10 AM in the South Party room - BUDGET PLANNING meeting

Friday, Nov. 14th at 10 AM in the North Party room - BOARD Meeting

All owners are encouraged to attend!

Golfing enthusiasts

You know it's the new season at Tiara when the weekly golf games are scheduled!

This year Tiara golf will generally play on Tuesdays. Al Alvandian is setting the tee times and courses, this year, and anyone interested in playing in this group, should e-mail Al. We play at a variety of lower cost courses around the area, and we are always looking for new interested players. Continue reading →

AC Maintenance Reminder

This summer saw hot and humid weather and with it more than a few Air Conditioning problems.    Conversations around the pool revealed that more than a few owners were unsure of how to respond to AC outages and the how and why of proper AC maintenance.     We worked with our Maintenance Supervisor, Doug Eisinger, and put together an AC Tips page which can be found from the Tiara website at Support / Maintenance / AC Tips.

Continue reading →

Over the Summer….

With October most of our snowbirds have returned to Tiara.     Life is getting busy again, golf and canasta have started up, and our first Happy Hour is scheduled for Friday Oct.31st.

Over the summer the staff at Tiara was busy and we've compiled a list of the maintenance items we've noticed that were completed this summer.   Continue reading →

Annual Meeting – Dec 10, 2014

The Annual Meeting for Tiara Owners is scheduled for Wednesday, Dec 10th at 10:00 AM in the South Tower Clubroom.   Election of Board members will take place at that meeting.

All Owners recently received the First Notice of this meeting in the mail along with information about the Election of Directors for the Tiara Towers Condominium Association.    If you would like to be a candidate for the Board please send in your Notice of Intent along with information about your background, education and qualifications to be a candidate.      Your candidate information should be mailed to Ron Hutchins, President, at:

Elliott Merrill Community Management
835 20th Place
Vero Beach, Fl 32960

In the information sent to you about the meeting you were also sent your Owner Directory information as it is on file for the annual directory.     If your information remains the same as it appears in the 2014 Directory you do not need to return the directory information sheet.   But if it's changed, or you would like it to appear differently than in last year's directory, or if you are not included in the directory, or if you are a new Owner, please make whatever updates are needed, SIGN the form and return it to Elliott Merrill at the above address.

Directory information should be returned to EM by November 5th, in order to be included in the 2015 Homeowner's Directory.

 

Easier Access

FOB avl

North Beach Association Oct 13, 2014

Highlights of the last Directors' Meeting of the North Beach Association

  • New owners of the old Radisson site hoping for a new zoning code
  • New obstacle course at Seal Museum
  • New bridge proposed for South Causeway
  • Environmental Impact Study published for All Aboard Florida
  • Next Member Meeting is Nov. 10th at old Ft Pierce City Hall

New Zoning Code - St Lucie County is considering the creation of a new zoning code, "hotel resort", which could be used by the new owners of the Radisson property (corner of Shorewinds and A1A) as they move forward with their design for the property.     The "hotel resort" code would allow the development of property that would have the characteristics of a 4 star resort hotel and allow investment by private individuals in one or more of the larger units to be built.    Right now this new zoning code is still under consideration by the Planning and Zoning Commission and once agreed upon by this Commission will go to the Board of County Commissioners for their approval.  Only after the zoning code is approved will any property owner be able to submit an application to use the new zoning code.    In other words, while the new owners of the Radisson site are still hoping to develop their property, it will be years before there can be a new hotel and restaurant on the property.

SEAL Museum - A children's obstacle course is being completed on the grounds of the Navy SEAL Museum.  This free obstacle course will be a 1/4 scale replication of the actual obstacle course at the SEAL training facility in Coronado, California.     It's nearly ready to be opened and looks to this observer to be pretty big....teens might enjoy it, and even some very fit older folks.    Can't wait to have the grandkids check it out at Thanksgiving!

South Causeway Bridge - The Coast Guard evaluated the vehicle traffic using the South Causeway bascule bridge (drawbridge) and determined that a "service" problem exists at that bridge (FDOT Bridge # 940045).   There are 7000 cars crossing the bridge annually.   As a result of this study FDOT  has authorized $1.5 K for refurbishment in 2015 with the objective of lasting another 4 years.   In 2018 FDOT has plans to start the construction of a new 65' highrise fixed bridge with completion in 2019.   This would be YEARS ahead of the old schedule!   As currently described it would be a two lane bridge at a cost of $58.9 M.   You may have noticed the recent surveyors on the roadway and the pink and orange tape along the route, which means the design for the bridge has already begun.

All Aboard Florida - The draft Environmental Impact Study (EIS) for the All Aboard Florida high speed rail project was published in late September.  The Federal Rail Administration (FRA) has allowed a 75 day comment period for the review of this 500+ document and its umpteen appendices, of upwards of another 1000 pages, by the All Aboard Florida team and any and all citizens.    Dec 3rd is the end of the 75 day comment period and comments must be in writing and can be sent as email to Mr. John Winkle at aaf_comments@vhb.com

Mailing address is:

Mr. John Winkle
Federal Railroad Administration
1200 New Jersey Avenue
SE Room W38-311
Washington, D.C. 20590

Completion of a final EIS, following the draft version, is a major step toward All Aboard Florida getting approvals and funding to complete Phase II of the railway from Orlando to West Palm Beach.    Phase I, from West Palm Beach to Miami, is already approved and underway.    All Aboard Florida has asked for a $1.5 Billion RRIF loan from the FRA (your tax dollars) to complete a new rail section from Orlando to the FECI corridor at Cocoa and a 2nd rail line all along the existing FECI corridor from Cocoa to West Palm Beach.   Trains will run through the Treasure Coast at speeds up to 110 mph 32 times each day.   Costs for enhancements to the 353 grade crossings along the way for safety and quiet zones could be the responsibility of local governments.  

All Aboard Florida is currently running commercials claiming that it will reduce congestion on Florida's highways and provide a safe transportation alternative for the travel between Orlando and Miami.     Florida NOT All Aboard researchers have shown that the amount of congestion that AAF claims to reduce is actually equivalent to removing 1 car from your interstate highway congestion every 4 miles.  Furthermore the congestion gets transferred to local community grade crossings and impacts 10-20 times more vehicles than AAF claims to remove from the interstate highway congestion.   With regard to safety, the highway fatalities that would be saved by lowering the highway vehicular traffic is slightly more than 1 life per year.  Although it may be true that there will be zero passenger fatalities, based upon the past 15 years of FECI railway statistics researchers have estimated that AAF trains will kill an additional 29 residents of local communities in train accidents along the train's route.